Plywood Overlay supplied and fitted near Oare (room view)

Subfloor preparation · Faversham, ME13

Plywood Overlay Before Vinyl or LVT — Faversham

When a plywood overlay is right for timber floors in Faversham, including grade, thickness and fixing centres for a stable base.

  • Free survey and measure
  • Fitted by our own team
  • Preparation priced in writing
  • Faversham and ME13 covered
Subfloor preparation page — Explains when a plywood overlay is the right subfloor solution for timber floors in Faversham before vinyl or LVT is fitted.

Timber floorboards move, flex and have gaps between them, none of which suit resilient floorcoverings like LVT or sheet vinyl that need a smooth, stable, continuous surface. A plywood overlay is screwed down over the boards to bridge those gaps and stop movement telegraphing through the new floor. In Faversham properties with original or aged board floors, this is usually the deciding factor in whether an overlay is specified before fitting begins.

Timber suspended floors turn up often enough in Oare that we treat squeaks and springiness as a screwing-down and packing job first, before any covering gets discussed.

When overlay works and when it does not

  • Sound, secure floorboards with no rot, woodworm or significant sag suit an overlay
  • Boards that flex noticeably underfoot need fixing or replacing before ply goes down
  • Very uneven or bowed boards may need packing or partial replacement first
  • Suspended timber floors need adequate under-floor ventilation maintained, not sealed off
  • Where boards are beyond repair, replacement is the more reliable route rather than overlaying a failing base

Choosing plywood grade and thickness

Plywood should be WBP grade suited to flooring use, with a sanded face where a resilient floorcovering will be fitted directly on top, since surface texture can telegraph through thin materials.

Use caseTypical thicknessGrade notes
Domestic overlay before LVT or vinyl6-9mmWBP (weather and boil proof) plywood, sanded face
Higher traffic or commercial areas9-12mmWBP plywood, thicker for extra rigidity
Overlay before carpet with a good underlay5.5-6mmStandard WBP grade acceptable
Uneven boards needing extra bridging9mm+Thicker sheet to span minor undulation

What we need to see before pricing

  • Confirm existing floorboards are sound before committing to an overlay
  • Check under-floor ventilation is adequate on suspended timber floors
  • Agree the correct plywood grade and thickness for your chosen floorcovering
Plywood Overlay detail photographed on a Faversham project (underside view)

Step by step through your plywood overlay job

  1. Step 1

    Inspect boards

    Check existing floorboards for soundness, movement, damp and ventilation before deciding to overlay.

  2. Step 2

    Select ply

    Choose WBP plywood at the correct thickness and grade for the floorcovering going on top.

  3. Step 3

    Cut and stagger

    Cut sheets to fit with a perimeter expansion gap, staggering joints between rows.

Faversham subfloor conditions

Timber suspended floors turn up often enough in Oare that we treat squeaks and springiness as a screwing-down and packing job first, before any covering gets discussed.

Timber suspended floors turn up often enough in Oare that we treat squeaks and springiness as a screwing-down and packing job first, before any covering gets discussed.

Screw centres and fixing pattern

  • Sheets staggered in a brick-bond pattern so joints do not line up between rows
  • A small expansion gap left around the room perimeter
  • Screws set at close centres across the sheet, not just around the edges, to stop drumming underfoot
  • Screw heads driven flush or slightly below the surface so they do not show through resilient flooring
  • Fixings located to hit joists or existing boards securely, avoiding pipework or cables below

Detail, preparation and finish

Plywood Overlay detail photographed on a Faversham project (underside view)
Plywood Overlay detail photographed on a Faversham project (underside view)
Room cleared and swept ready for plywood overlay (before fitting)
Room cleared and swept ready for plywood overlay (before fitting)
Room reinstated after plywood overlay work near Oare (signed off)
Room reinstated after plywood overlay work near Oare (signed off)

Images show our own flooring work across Kent. Photographs are illustrative of the type of work described, not of a specific customer address.

Coverage across the district

Districts we serve

  • Oare
  • Boughton-under-Blean
  • Preston
  • Ospringe

How we travel

  • M2 Junction 6/7
  • A2
  • A251

Postcode district ME13, Swale Borough Council.

Where we do site work

  • Faversham town centre
  • Brogdale
  • Whitstable Road industrial

Why Faversham customers choose us for plywood overlay

  • Fitted by our own team — we do not subcontract the installation.
  • Subfloor preparation written into the quote rather than added later.
  • Supplied direct from our own warehouse stock.
  • One point of contact from survey through to the finished floor.
  • Old floor uplift and disposal agreed in writing before the fitting date.
Where we are

Unit 9, Matilda Close, Gillingham Business Park, Gillingham

We reach Faversham via the A2, and cover the wider ME13 district as part of our normal round.

Frequently asked: plywood overlay in Faversham

Can I fit LVT straight onto floorboards without plywood?

It is not recommended. Gaps and movement between boards will telegraph through LVT over time and can affect the click joints or adhesive bond, so a plywood overlay is the standard preparation.

How thick should plywood overlay be?

It depends on the floorcovering and traffic level, typically 6-9mm for domestic LVT or vinyl and thicker where more rigidity is needed, as set out in our thickness guidance for your specific job.

Will plywood overlay raise my floor height much in Faversham?

It raises the floor by roughly the thickness of the sheet used, which we account for at survey stage so doors and thresholds in your Faversham property are checked before work starts.

Is overlay cheaper than replacing floorboards?

Overlay is generally less disruptive than full replacement where the boards are sound, since it avoids lifting and disposing of the existing floor structure.

Closing summary

A plywood overlay bridges gaps and movement in timber floors, giving resilient flooring the stable base it needs. We specify grade, thickness and fixings to suit your Faversham property.

Timber floor in Faversham needing preparation?

We will assess your boards at survey stage and recommend overlay or replacement honestly.

Free quote