Preparing the ply surface for the chosen floorcovering
Once fixed, joints between sheets are usually filled and sanded so the surface presents as one continuous, flat plane rather than a series of visible seams under a thin floorcovering.
Any residual dust is vacuumed thoroughly before fitting continues, since debris trapped under LVT or vinyl can telegraph through as a visible bump.



