Moisture testing before {town} jobs proceed
Before any levelling compound goes down, moisture is checked using a hygrometer in line with standard practice for resilient flooring, sealing test points for the manufacturer's stated conditioning period rather than taking an instant surface reading. Where readings are too high for the intended flooring, a damp-proof membrane is applied before proceeding.



