Sequencing a fit-out around fixed fittings
Basins, styling chairs and reception desks are often plumbed in or fixed to the subfloor, which affects the order flooring can go down in relative to these fittings. Where possible, flooring is fitted before fixed furniture is reinstalled, though refurbishments of an existing trading salon usually mean working around units that stay in place.
- Sequencing agreed with the salon owner around plumbed basins and fixed fittings
- New-build fit-outs generally allow flooring first, before furniture installation
- Refurbishments of trading salons often require working around fixtures left in situ



