How to Prepare a Room Before Fitting Day

A room by room checklist for the days before your flooring is fitted: furniture, doors, appliances, decorating order, parking and what fitters need on site.

For customers with a fitting date booked who want the day to run without delays or extra charges.

Most flooring jobs that overrun do so for reasons that had nothing to do with the flooring. A room that was not cleared, a door that could not be removed, a car blocking the only unloading point, or a decorator still working in the room.

Half an hour of preparation on your side usually saves an hour on ours, and on a job priced by the day that difference is real money. Here is what actually helps.

Flooring fitter preparing a cleared room before installation

One week before

  • Finish all decorating, including gloss on the skirting, so nothing is wet on the day
  • Confirm the fitting date and the expected arrival time
  • Check whether doors will need trimming and agree who is doing it
  • Arrange parking close to the property, and a permit if your street needs one
  • Make sure someone over eighteen will be present for the whole visit

The day before

  • Empty wardrobes, drawers and bookcases so heavy furniture can be moved safely
  • Take down curtains and blinds where they hang into the working area
  • Disconnect and pull out washing machines and dishwashers if the floor runs under them
  • Remove everything from the floor including rugs, floor lamps, toys and pet beds
  • Take doors off where you can, and lean them somewhere safe out of the room
  • Lift and store anything fragile, because fitting is physical work in a confined space

What we need from you on the day

Access to a power socket for cutting equipment, somewhere to unload material near the door, and a clear route from the van to the room. For solid floors, access to water is helpful if latex is being mixed.

It also helps enormously if the property is at normal living temperature. Wood and vinyl both need to be at room temperature before they are fitted, and a cold house in January can add hours to a job while material acclimatises.

Furniture: what we move and what we do not

Typical furniture handling on a domestic fitting
ItemWho moves it
Sofas, beds, wardrobes (emptied)We can move these, agreed in advance
Full wardrobes and chests of drawersMust be emptied by you first
Pianos, safes, fish tanks, gym equipmentSpecialist removal, arranged by you
Washing machines and dishwashersDisconnected by you, we can slide them out
Fitted kitchen units and appliances built inStay in place, we cut around or run beneath
Televisions and electronicsPlease move and unplug before we arrive

Doors, thresholds and the details people forget

A new floor is almost always thicker than the one it replaced, so internal doors frequently need three to six millimetres taken off the bottom. Not every fitter carries the tools to do this properly, so agree it in advance rather than discovering it at four in the afternoon.

Also think about where the floor stops. Every doorway needs a threshold trim, and the finish should be agreed before the day rather than chosen from whatever is in the van.

Pets, children and dust

Fitting involves knives, tack strips with sharp pins, adhesive and power tools, so pets and small children need to be out of the working rooms entirely. A closed door is not always enough with a determined cat.

There will be dust, particularly if an old floor is being lifted or latex is being sanded. We sheet up and clear away, but keeping doors closed to the rest of the house makes a noticeable difference.

After we leave

Ventilate the room for a day or two, especially with new vinyl or adhesive. Wait 24 hours before putting heavy furniture back onto a glued floor, and 48 hours before turning underfloor heating back on, raising it gradually.

Keep any offcuts we leave you. They are the easiest way to test a cleaning product safely and the fastest route to a matching repair later.

If you are having several rooms done

On a multi-room or whole-house job, the order of work matters as much as the preparation. Agree a room sequence in advance so you always have somewhere to put furniture and somewhere to sleep, and expect to shuffle contents from room to room as the work moves through the house.

Clear a staging area near the front door for material and offcuts, and keep one route through the house clear from front door to work area throughout. Fitters carrying a four metre roll cannot pick their way round obstacles.

Plan for the messiest stage first. If any latex screeding or old floor removal is happening, get it done at the start of the job rather than between two finished rooms, so dust travels through spaces that are still empty.

Frequently asked questions

Do I need to empty the room completely?
For hard floors, yes. For carpet we can work in halves if necessary, but a clear room is faster and gives a better result.
Will you trim my doors?
Usually yes, if it is agreed when we quote. Fire doors and glazed doors need particular care and may be a joiner's job.
Do I need to be at home all day?
Someone over eighteen needs to be present, though they do not have to be in the room while we work.
How long before I can walk on the new floor?
Carpet and click floors are immediate. Glued floors are best left for 24 hours before heavy traffic or furniture.