How the work is done

How Long Will Your Flooring Installation Take?

Realistic timings for carpet, LVT, laminate and vinyl fitting, including subfloor drying times, stairs, whole houses and what delays a job on the day.

For anyone planning around a fitting date and needing to know when the room is usable again.

The fitting itself is often the shortest part. What sets the overall timescale is preparation and drying, because latex, adhesive and screed all need their own time before anyone can walk on the floor.

These are working timings from real jobs rather than best-case figures, so you can plan furniture, deliveries and time off around them.

Subfloor levelling compound drying before flooring is fitted

Typical fitting times by room and product

Guide timings for a prepared subfloor
JobTypical time on site
Single bedroom carpet2 to 3 hours
Lounge in laminate or click LVTHalf a day
Kitchen in glue-down LVTFull day, plus prep the day before
Bathroom in sheet vinylHalf a day
Stairs and landing carpetMost of a day
Herringbone LVT in a large roomTwo days
Three-bedroom house, mixed floorsThree to five days

Preparation is what extends the programme

  • Latex screed usually needs overnight before flooring goes down, longer if applied thickly
  • Plywood overlay adds most of a day in a medium room, screwed at close centres
  • A new sand and cement screed can need weeks to dry before a floor can be bonded to it
  • Damp proof membranes need their own cure time before anything is laid over them

Acclimatisation, and when it is genuinely needed

Wood and some LVT ranges are left in the room before fitting so the material settles to the temperature and humidity it will live in. Skipping it is a common cause of gapping in engineered wood a few weeks later. Carpet and sheet vinyl need far less, though vinyl relaxes better if unrolled first.

What delays a fitting day

  • Furniture that has not been cleared, which turns a fitting day into a moving day
  • A subfloor problem only visible once the old floor is lifted, such as damp or rotten boards
  • Doors that will not clear the new build-up and need easing before rooms can be used
  • Access and parking, particularly terraced streets and flats with no lift

When you can use the room again

Carpet and click systems are usable straight away. Glue-down LVT and bonded vinyl want light foot traffic only for the first 24 hours, and heavy furniture should stay off until the adhesive has cured, typically 48 hours. Put felt pads on furniture legs before it goes back.

Phasing a whole house or a working premises

Occupied houses are usually done room by room so there is always somewhere to sleep. Commercial sites are phased by area and often fitted outside trading hours, which lengthens the calendar but keeps the business open. Both are planned at survey stage, not on the morning.

Frequently asked questions

Can it all be done in one day?
A single room, usually yes. A whole house or anything needing screeding will not be, because the preparation has to dry.
Do I need to move the furniture?
Clearing what you can speeds the job and reduces cost, but we move normal household furniture where needed.
How soon can I put the beds back?
Same day on carpet. On glue-down floors, leave heavy items off for around 48 hours while the adhesive cures.
Will you take the old flooring away?
Yes, uplift and disposal are quoted with the work so nothing is left in the garden.