close up of solid oak board grain and joints in Gillingham, Kent

Solid wood flooring in Gillingham

Solid wood flooring in Gillingham

Solid wood flooring fitted across Gillingham, Kent. Secret nailing, full bond, moisture checks and honest advice on suitability.

Solid, single species boards fitted by our own employed fitters, with a written quote after a proper site check.

Gillingham covers a mix of housing stock, from Victorian terraces with suspended timber floors to newer builds on solid concrete slabs, and that difference decides how a solid wood floor gets fitted before we even talk about which species to choose. Older Edwardian terraces around Twydall often has joists ready for secret nailing, while newer builds nearer Pier Approach usually sit on screed, which calls for full bond fitting instead. We check the subfloor on the measure visit, not from a photo, because guessing wrong here is expensive to put right.

Victorian and Edwardian terraces around Twydall in Gillingham typically have suspended timber floors with joists at fairly regular centres, which usually suit secret nailed solid wood well once any loose boards and squeaks are dealt with first.

New build Edwardian terraces near Pier Approach in Gillingham sits on a solid screed slab, which means full bond fitting for solid wood rather than nailing, and a screed moisture check before any adhesive goes down.

secret nailed solid wood floor in a hallway near Twydall, Gillinghamsolid wood boards bonded to a screed floor near Twydall, Gillinghamsanded and refinished solid oak living room floor near Twydall, Gillingham

Ask about solid wood in Gillingham

Request a Free Quote

Free site survey · No obligation · Response within 1 working hour

Suspended timber floors versus solid concrete around Gillingham

Whether a Gillingham property has a suspended timber floor or a solid concrete slab decides the fitting method for solid wood before anything else is discussed. Suspended floors with joists at reasonable centres are usually ready for secret nailing once battens are checked and any loose boards are refixed. Solid slabs need a screed check and a full bond approach instead.

We identify which type of subfloor sits under a Gillingham room on the measure visit, lifting a board or checking access where needed, rather than assuming from the age of the house alone.

  • Suspended timber floors typically suit secret nailing
  • Solid concrete slabs typically suit full bond
  • Joist centres and condition are checked before quoting
  • Screed age and moisture are checked on solid floors

Heating patterns in Gillingham homes and what they mean for solid wood

Solid wood moves with humidity, and a Gillingham home run cold through the week and heated hard at weekends will put more strain on boards than one kept at a steady temperature. We ask about typical heating use on the measure visit because it affects the width of board and the expansion allowance we plan for.

Underfloor heating changes the picture entirely. Where a Gillingham customer has it fitted, we generally recommend engineered wood over solid, and explain the reasoning before any quote is written up.

Screed and plaster drying times on Gillingham renovations

Renovation and extension work near Pier Approach in Gillingham often finishes with new screed and fresh plaster shortly before flooring is due, and both need proper drying time before solid wood goes down. We ask when wet trades finished on any Gillingham refurbishment before confirming a fitting date.

Where drying time has been too short, we would rather delay a Gillingham fitting date by a couple of weeks than fit solid wood into a subfloor that is still releasing moisture underneath it.

Typical subfloor situations across Gillingham
Property typeLikely subfloorFitting approach
Victorian terrace near {nb}Suspended timber joistsSecret nailing to battens or joists
New build near {zone}Solid screed slabFull bond, screed checked for moisture
Extension or conversionMixed, often new screedScreed drying time confirmed before fitting
Period {stock}Older suspended timber, sometimes unevenLevelling or joist repair before nailing

Rooms across Gillingham where we would not recommend solid wood

Bathrooms, wet rooms and unheated conservatories on Gillingham properties are rooms we generally advise against for solid wood, regardless of how the rest of the house is finished. Basements and cellar conversions near Twydall carry the same risk, since moisture control below ground is harder to guarantee.

We would rather tell a Gillingham customer plainly that a room does not suit solid wood at the quote stage than fit it and have it fail within a year.

  • Bathrooms and wet rooms
  • Unheated conservatories and garden rooms
  • Basements and cellar conversions
  • Rooms with underfloor heating already fitted

What we check before quoting in Gillingham

  • Confirm whether the subfloor is suspended timber or solid screed before quoting a fitting method
  • Check joist or batten centres and condition where secret nailing is planned
  • Take a moisture reading on the screed where full bond fitting is planned
  • Take a moisture reading on the delivered boards before fitting begins
  • Confirm room temperature and heating status ahead of board acclimatisation
  • Ask when plaster and screed were last laid on any recent renovation

How the solid wood job runs

  1. 1
    Site survey and subfloor check

    We identify whether the room has suspended timber joists or a solid screed slab, check condition, and take initial moisture readings before quoting a fitting method.

  2. 2
    Species and board selection

    We bring samples for the room's light and traffic level, and talk through oak, ash, walnut or maple against how the room is actually used day to day.

  3. 3
    Acclimatisation

    Boards are delivered and left to settle to the room's temperature and humidity, with heating run at normal levels, before fitting starts, avoiding gaps caused by fitting too soon.

  4. 4
    Subfloor preparation

    Battens or joists are checked and fixed for nailing, or the screed is primed and confirmed dry for full bond, with any repairs completed before boards go down.

  5. 5
    Fitting: secret nailing or full bond

    Boards are laid with a perimeter expansion gap and either secret nailed through the tongue into battens or joists, or bonded with flexible adhesive to a prepared screed.

Solid wood flooring questions from Gillingham customers

Do you fit solid wood flooring in Gillingham?
Yes, we survey the property first to identify whether it has suspended timber joists or a solid screed slab, since that decides the fitting method, then provide a written quote.
Can you tell if my Gillingham house suits solid wood before I book?
We can give a rough view from the age and type of the property, but a proper answer needs a site visit to check the subfloor and take moisture readings.
Is my Gillingham extension on a slab or joists?
Extensions are usually built on a solid screed slab even where the original house has suspended timber floors, so we check each area separately on the measure visit.
Do you fit solid wood over underfloor heating in Gillingham?
We generally advise against it and recommend engineered wood instead, since solid timber reacts to sustained heat from below with more movement than a stable engineered board.
How long before fitting does the screed need to dry in Gillingham?
It depends on screed thickness and site ventilation, which is why we take a moisture reading before confirming a fitting date rather than working to a fixed number of days.
Can you sand and refinish an existing solid wood floor in Gillingham?
Yes, provided there is enough timber left above the tongue and groove. We check board thickness on site before quoting a sand and refinish.

Booking solid wood in Gillingham

Solid wood is timber right through, which is exactly why it can be sanded and refinished for decades rather than replaced when it wears. Getting there depends on the fitting method matching the subfloor and the moisture readings being right before a single board goes down.

Free quote