Whole house jobs go smoother when the order is planned. Hard floors usually go down first, then carpets, with trims fitted where the two meet. Doing it as one job means one survey, one quote and consistent heights between rooms.
If building work is happening, timing matters. New screed needs time to dry before flooring, and our guide on screed still drying explains why fitting too early causes problems. We can test moisture before we commit to a date.
Home offices are another common request. Hard floors suit office chairs, and a chair mat on carpet protects it, which our home office guide covers.
If your renovation involves builders, electricians and decorators, let us know the overall timetable. Flooring usually goes in near the end, after painting where possible, and before skirting is refitted if you want the neatest edge. Fitting in the right order avoids damage to new floors from ladders, dust sheets and the general traffic of other trades.
Tonbridge: common questions
- When should flooring go in during a renovation?
- After wet trades and dust are finished and the base is dry. We can check moisture before booking.
- Can you fit around kitchen units?
- Yes, though whether the floor goes under or up to the units depends on the product. We agree it at survey.
- How long does a whole house take?
- It depends on size and preparation. The survey gives a realistic estimate.
- Do you remove old carpet and gripper?
- Uplift and disposal of old flooring, including gripper where needed, can be included in the written quote. Mention it at the survey so it is priced in from the start rather than added later.
